MT 210 Assembly & maintenance exercise: refrigeration

Using MT 210 trainees can learn working within a complex project. This involves the planning, implementation and checking of processes related to assembly, commissioning and maintenance. The assembly relates to refrigeration installation: installation of the LP and HP pressure switches, the expansion valve and the pipework of the refrigeration circuit. The pipe joints are not soldered but bolted. The electrotechnical installation includes the wiring and connection of all units and switching elements.

For assembly the tool set ET 150.02, for commissioning the system the filling and evacuation equipment ET 150.01 are required.

The fully assembled system MT 210 represents a fully functional, temperature-controlled refrigeration system with refrigeration chamber and electrical thermostat. Repeated assembly and disassembly are possible.

The experiment is arranged on a workbench with drawers for storing the components and tools. Assembly panel and refrigeration chamber are mounted on a frame. Frame, condensing unit and switch cabinet are bolted permanently to the working surface. The refrigeration and electrical components are attached to the aluminium assembly panel.

  • study project with high practical relevance
  • suitable for training in metal and electrical professions
  • interdisciplinary and covering several subject areas
  • assembly of a refrigeration system from individual components

Condensing unit

  • power consumption: 190W
  • refrigeration capacity: 373W at 5°C evaporation temperature
  • receiver: approx. 1L

Show case evaporator

  • capacity: 50W at t0=-6°C, ΔT=8K
  • transfer area: 1,06m2

Refrigeration chamber with sight window

  • LxWxH: 480x280x390mm

Aluminium assembly panel

  • LxW: 710x500mm

Thermostatic expansion valve, adjustable
Thermostat, adjustable: -30…15°C

 

230V, 50Hz, 1 phase
120V, 60Hz, 1 phase; 230V, 60Hz, 1 phase
UL/CSA optional

  1. assembly project for the training of mechatronics engineers for refrigeration
  2. assembly of a refrigeration system with refrigeration chamber from a complete kit
  3. refrigeration system designed for operation with refrigerant R134a
  4. temperature control via thermostat
  5. air-cooled condensing unit with compressor
  6. refrigeration chamber with integrated show case evaporator and fan
  7. refrigeration chamber with large sight window
  8. assembly panel to mount the refrigeration and electrical components
  9. electrical assembly in accordance with the circuit diagram
  10. easy pipeworking of the refrigeration circuit using bolted pipe joints
  11. workbench with drawers to store the components
  12. part of the GUNT-Practice Line for assembly, maintenance and repair
  • reading and understanding technical documentation
  • in conjunction with ET 150.02
    • planning and executing assembly steps and processes
    • making pipe joints in accordance with a system diagram
    • carrying out electrical installation in accordance with a circuit diagram
  • in conjunction with ET 150.01
    • filling and evacuating of the refrigeration system
    • commissioning and checking the refrigeration system after successful assembly
    • familiarisation with the function of a refrigeration system as a system and its components as system components
    • fault analysis: fault finding, fault evaluation and repair
    • planning, executing and evaluating maintenance processes

Web offer

add product
Request for Quotation

Product number

MT 210